Skip to content

Product

One place for your buildings, your equipment and the work on them.

A live 3D copy of your buildings, a risk score for every piece of equipment, the work orders and planned maintenance your team runs on, and one list of what to repair or replace.

Book a demo
Four campus buildings in 3D on their real site, each outlined by risk and named, with the streets and offices around them
Map imagery: Google

Your buildings in 3D.

Open a building, lower the walls and click any piece of equipment to see its condition, its open work and what it costs to replace.

See the digital twin
A plant room in Rivolq with a hot water boiler selected: risk 47, criticality 5 of 5, 7 open work orders, $218k to replace, 24 pieces of equipment depend on it

The work your team does every day.

Requests, work orders, planned maintenance and parts in one place. You always know what is overdue and who is on it.

See the maintenance software
Rivolq work orders screen: 59 active jobs, 68 past due, 9 unassigned, and the three that need attention first

What is most likely to fail next.

Every piece of equipment is scored from 0 to 100, with the riskiest first and the reason beside each one.

See failure risk
Rivolq risk screen for five buildings: overall risk 42, $997.4K at risk across 283 pieces of equipment, 28 of them high-risk, buildings ranked by cost, and the equipment driving the risk

What to repair or replace, and when.

One list with what each job costs and what waiting costs you each year.

See repair and replacement planning
Rivolq planning screen titled What should we fund: 33 pieces of equipment, each with a risk score, a replace action, a cost, a yearly loss and a due year, beside a budget panel

Reports your board can read.

Written from your own records, for the reader you pick.

See reports
A finished Rivolq portfolio overview open on screen: a summary covering 283 pieces of equipment across five buildings worth $6.4 million, followed by numbered findings

It all runs on the same records.

  1. 1

    Enter it once

    A piece of equipment is the same record in the twin, on a work order and in the plan.

  2. 2

    Work changes the score

    Open and overdue work raises the risk score for as long as it waits.

  3. 3

    One list of buildings

    Work, equipment and reports can all be narrowed to the buildings you choose.

See all of it on a campus like yours.

Book a demo and we will walk you through it.

Book a demo

Every picture on this page is the product itself, showing our demo campus.

Rivolq
Book a demo